Place of Origin:
Jinan,Shandong,China
Brand Name:
Shandong Juxin Steel Structure Co., ltd
Certification:
ISO 9001
Model Number:
Customized
Constructing a prefab modern design steel overhead viaduct steel bridge involves specific considerations to ensure the desired outcome. Here are the steps you can follow:
Design and Planning:
Collaborate with bridge design and engineering professionals experienced in modern steel bridge construction.
Determine the purpose, span, and load requirements of the viaduct bridge.
Discuss the desired modern design aesthetics, such as sleek lines, innovative features, and integration with the surrounding environment.
Material Selection:
Opt for high-quality structural steel suitable for bridge construction.
Consider the specific requirements for modern design, such as steel with excellent formability for unique shapes or profiles.
Ensure the selected steel meets the necessary strength and durability standards for the bridge's intended use.
Conceptualization and Visualization:
Work closely with designers to develop a modern and visually appealing bridge concept.
Utilize computer-aided design (CAD) software to create 3D models and visualizations to aid in the design process.
Pay attention to details such as the bridge's curvature, architectural elements, and integration with surrounding infrastructure.
Prefabrication and Modular Construction:
Opt for prefabrication and modular construction methods to enhance efficiency and quality.
Prefabricate bridge components off-site under controlled conditions to ensure precision and quality control.
Modular construction allows for faster assembly on-site, reducing construction time and disruption.
Structural Analysis and Engineering:
Engage structural engineers to perform a detailed analysis of the bridge design, ensuring it meets safety and structural integrity requirements.
Verify that the design accounts for anticipated loads, including traffic, wind, seismic forces, and any unique considerations for an overhead viaduct.
Quality Control and Inspections:
Implement stringent quality control measures throughout the fabrication and construction processes.
Conduct regular inspections during fabrication to verify compliance with design specifications and industry standards.
Engage third-party quality control agencies to perform independent inspections and tests as needed.
Construction and Installation:
Hire experienced bridge construction contractors with expertise in modern steel bridge construction.
Follow proper construction methods to ensure precise assembly and alignment of prefabricated components.
Employ skilled professionals to handle the installation of the steel bridge, ensuring accuracy and safety.
Finishing and Aesthetics:
Pay attention to the finishing touches to achieve the desired modern design aesthetics.
Consider surface treatments, such as paint or coatings, to enhance the appearance and protect the steel from corrosion.
Incorporate lighting and other design elements to accentuate the modern features of the bridge.
Maintenance and Longevity:
Develop a comprehensive maintenance plan to ensure the long-term durability and aesthetics of the steel viaduct bridge.
Regularly inspect the bridge for any signs of corrosion, wear, or damage, and address them promptly.
Follow recommended maintenance practices, including periodic cleaning and inspections of the steel components and finishes.
By following these steps and working with experienced professionals, you can construct a prefab modern design steel overhead viaduct steel bridge that combines aesthetic appeal and structural integrity.
Product Parametes
Specifications of 200type Bailey Bridge | |||
Lanes | Single Lane | Double | customized |
width | 4.2 | 7.35 | No Limitation |
Maximum span | 30-230feet (10feet/section) |
30-180feet (10feet/section) |
Customized |
Bridge deck | Steel | ||
Steel Grade | Q345B | ||
Loading Capacity | According to The Requirements, Such as HS20-44/Truck 20 | ||
Corrosion | Original Painted or Hot Dip Galvalized | ||
Advantages |
Lower Price/Convenient Transportation/ Easy Asembly and Erection |
Company Profile
Shandong Juxin Steel Structure Co., ltd located in Jinan, Shandong,a city famous for its long history and Culture The company, is a professional enterprise with grade II certificate on contracting steel structure construction. By the time it has 800 staff members, of which 30 per cent are technical and managerial workers .The company covers an area of 13,000 square kilometers and the workshop occupies 13,000 square kilometers. The company is mainly engaged in constructing steel structure workshops, stadiums, large markets,residence buildings, office buildings, bridges and decorative steel structure engineering. It also undertakes the processing and manufacturing of chemical steel structure and power factories.
Product Description
Our advantage
With own manufacturing operations complimented by strategic sourcing, we are able to cater for a full range of product needs:
1. Sheet metal fabrication, such as steel bases, steel structure, support, box, enclosure, etc
2. CNC machining machinery part. Such as OEM/ODM flanges, shaft, connector etc.
3. Metal forging parts
4. Metal casting parts
5. Livestock parts
Smart operational structure ensures superior quality and service:
1. ISO 9001 certified facilities
2. Low overheads due to effective and lean structure
3. Multi-layered QC - strong track record in delivery performance
4. Professional, multi-lingual customer service
5. Technical engineering support
6. Flexible payment terms
Certifications
Customer Case
How to consult us about your bridge? Refer to the items below.
1. Usage: military steel bridge, traffic engineering,dangerous bridge reinforcement or other aspects. etc.
2. Total length: 15m- 60m or others.
3. Quantity of the span: single span or double span.
4. Width: single lane 4.2m, double lane 7.35m.
5. Load: HS15-HS25 or others.
6. Surface treatment: painting or galvanization
It is better to provide drawings.
Send your inquiry directly to us