Home > products > Steel Structure Workshop >
Metal Prefab steel structure workshop factory Building Contemporary

Metal Prefab steel structure workshop factory Building Contemporary

Metal Prefab steel structure workshop

Factory Building steel structure workshop

Contemporary steel structure workshop

Place of Origin:

Jinan,Shandong,China

Brand Name:

Shandong Juxin Steel Structure Co., ltd

Certification:

ISO 9001

Model Number:

Customized

Contact Us
Request A Quote
Product Details
Brand Name:
Shandong Juxin
Delivery Time:
15-21 Days
Residential Wall Structure:
Wall Stud
Design Style:
Contemporary
Frame:
H Section
Design Load:
Wind, Snow, Seismic
Main Steel:
Q355, Q345, Q235, Q345B, Q235B Etc.
Secondary Frame:
Hot Dipped Galvanized Purlin
Steel Grade:
Q235
Sandwich Panel Thickness:
Between 50-200mm
Payment & Shipping Terms
Minimum Order Quantity
1000
Price
$35
Payment Terms
T/T, L/C
Supply Ability
50000 tons
Product Description

Planning and Design Phase
Site Analysis: Assess the chosen location for accessibility, soil conditions, and compliance with local building codes.
Custom Design: Work with a design team to create a blueprint that suits your specific needs. Consider factors such as the size, layout, and functionality required for your workshop.
Engineering: Engage structural engineers to ensure the design is structurally sound and meets all safety and regulatory requirements.
Permits: Obtain the necessary permits and approvals from local authorities before proceeding with construction.
Manufacturing and Prefabrication
Component Fabrication: Components such as beams, columns, trusses, and panels are manufactured off-site in a controlled environment.
Quality Control: Ensure that all parts meet strict quality standards during fabrication.
Packaging and Marking: Components are labeled and packaged for easy identification and assembly on-site.
Transportation and Delivery
Logistics Coordination: Organize the transportation of prefabricated parts to the construction site, considering logistics such as vehicle access and scheduling.
Site Preparation: Clear the site and prepare the ground for foundation work if necessary.
Foundation Preparation
Site Clearance: Remove any obstacles and prepare the ground for the foundation.
Foundation Construction: Depending on the design, construct a concrete slab or pier foundations to support the structure.
On-Site Assembly
Unloading and Unpacking: Unload the prefabricated components and unpack them systematically.
Assembly: Using cranes and other lifting equipment, assemble the metal framework according to the provided instructions. This typically involves:
Placing the columns and beams.
Installing the roof trusses or purlins.
Attaching wall panels and roof panels.
Securing connections with bolts or welds.
Installation of Roof and Walls
Roof Panels: Install prefabricated roof panels, ensuring proper alignment and sealing.
Wall Panels: Install wall panels, which may include insulation and exterior finishes.
Sealing: Ensure all seams and joints are properly sealed to protect against water ingress and improve insulation.
Installation of Systems
Electrical Systems: Install electrical wiring, lighting fixtures, and any necessary electrical equipment.
Mechanical Systems: Set up HVAC systems, plumbing, and any specialized mechanical equipment required for the workshop operations.
Fire Protection: Install fire protection systems such as sprinklers and smoke detectors.
Flooring and Finishing
Flooring: Install appropriate flooring materials that are durable and suitable for the workshop's intended use.
Interior Finishing: Add any necessary interior partitions, offices, or storage areas.
Final Inspections and Handover
Final Inspection: Conduct a thorough inspection to ensure that all systems are working correctly and that the building meets all regulatory requirements.
Handover: Once the workshop is certified and ready, officially hand it over to the owner or operator.
Post-Construction Maintenance
Maintenance Plan: Establish a maintenance schedule to keep the workshop in optimal condition.
Regular Checks: Perform routine checks on the building’s structure and systems to identify and address any issues promptly.
Tools and Equipment Needed
Tower Cranes or Mobile Cranes: For lifting and positioning heavy components.
Bolting Tools: For securing structural connections.
Welding Equipment: If welding is required for certain connections.
Safety Gear: Such as hard hats, safety boots, and harnesses for worker safety.

Product Parametes

Steel structure building
1. Primary Framing
Painted or hot-galvanized H column and beam
2. Secondary Framing
Galvanized Z and C sections purlin
3. Roof and Wall panels
Steel sheet and insulated sandwich panels (EPS, fiberglass wool and PU)
4. Steel Decking Floor
Galvanized steel decking board
5.Structural subsystem
Canopies, fascias, partitions, etc.
6.Mezzanines, Platforms
Painted or galvanized H beam
7.Other Building Accessories
Sliding doors, roll up doors, aluminium windows, louvers, etc.
Drawings & Quotation:
(1) Customized design is welcomed.
(2) In order to provise an accurate quotation and drawings, please let us know the length, width, eave height and local weather.
We will quote for you promptly.

 

Company Profile

 

Shandong Juxin Steel Structure Co., Ltd. is specialized in building steel structure design, manufacturing, installation, maintenance as one of the professional enterprises. Integrated design, manufacturing, installation in one, with H-shaped steel; C, Z steel; Bolt ball joint grid; Color light roof panel, wall panel; office integrated activity room and other production lines, has its own professional design office, professional processing equipment, professional testing equipment, professional quality inspection personnel, professional manufacturing base, professional production and technical personnel, professional installation team and perfect operation, after-sales service team.
 

Metal Prefab steel structure workshop factory Building Contemporary 0

Product Description

 Metal Prefab steel structure workshop factory Building Contemporary 1

Metal Prefab steel structure workshop factory Building Contemporary 2

Metal Prefab steel structure workshop factory Building Contemporary 3

 

Our advantage

 

 

Metal Prefab steel structure workshop factory Building Contemporary 4

Metal Prefab steel structure workshop factory Building Contemporary 5

Metal Prefab steel structure workshop factory Building Contemporary 6

 

Metal Prefab steel structure workshop factory Building Contemporary 7

Certifications

 

Metal Prefab steel structure workshop factory Building Contemporary 8

Metal Prefab steel structure workshop factory Building Contemporary 9


Customer Case

Metal Prefab steel structure workshop factory Building Contemporary 10

We will consider the standards and specifications of each region. Therefore, by choosing us, you will obtain steel structure products that fully comply with the legislative requirements of your country/region. At the same time, we have many experiences in industrial buildings, public buildings, bridge buildings, marine engineering, livestock building, high-rise buildings, aerospace, military construction, and other fields.
We will carefully study your specific needs and specifically design and manufacture load-bearing structures suitable for your project.

Metal Prefab steel structure workshop factory Building Contemporary 11

 

FAQ

Q1: How long does it take to get my building?

A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)

Q2: What are the benefits of steel construction?
A: 1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.

Q3: Why choose JU XIN?
A: At JU XIN, the customer is the first priority. We don't pull any gimmicks. We are veteran owned and operated business, unmatched in customer service. We have more than 20 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.

Q4: How can l get the quotation of the project?
A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.

Q5: Do you offer designing service for us?
A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,
supermarket, auto dealer shop, shipping mall, hotel etc.

Q6: Do you provide samples?
A: Yes, we could offer the sample for free but do not pay for the cost of transportation.

Q7: What is your terms of payment ?
A: L/C, T/T, and Western Union.

Q8: How about your quality control?
A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.

Q9: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.

 

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality Steel Structure Workshop Supplier. Copyright © 2024-2025 juxinsteelstructure.com . All Rights Reserved.